Contents
-
Manufacturing
Rebuild Work Order costs hanging on End of File fixed
PO-A not properly pulling in Location address if Default Location is not the first on the list - Fixed
DC programs can now enter Scrap Codes (Based on default setting)
PO-C PPV calculation for Make From parts was looking at the total standard cost rather than the This Level Processing cost (Standard Costing method only)
PO-C label printing can now include Lot/Serial info for parts received
Most PO programs update to GUI Versions (Evo-ERP only)
Default to disble Delete PO button in PO-A