Contents -


Items
  • IN-B changing Item Status to Discontinued was checking too many parameters and preventing the status change.  Fixed.
  • IN-B sets Warehouse control for new items to the master default setting
  • Default setting for BM-A to allow type R parts to have a BOM for Engineering purposes
  • PI-H can now purge an old PI even if teh Location of that PI is now invalid